No. | Data | Information |
1 | Village Name | Mbinudita |
2 | Hamlet Name | Kilimbatu 2, Pahomba |
3 | RT | 11 |
4 | RW | 06 |
5 | PIC | Yakub Mbadi |
6 | Number of Families | 10 families |
7 | Number of peoples | 40 Peoples |
8 | Number of Houses | 7 Houses |
9 | Facilities built | Light Steel Public toilet 1 room |
10 | Point Coordinates |
-9.68039, 119.99157 |
Residents in Kilimbatu Village have 1 built water reservoir in their village. However, this area is very large and the population is very dense, so when constructing public toilet facilities, they proposed that each cubicle be separated so that the locations are spread out. The following is the location in Kilimbatu 1 village, residents started work by transporting light steel frames to the MCK location and on that day the mortar and other materials were unloaded.
Community participation in Kampung Kilimbatu is very good.